New Build, New Regs: Is Your EV Charging Plan Compliant?
Part S of the Building Regulations now mandates EV charging in all new non-residential builds. FusionTek provides a complete, end-to-end turnkey solution.
Stop juggling contractors. One partner for your entire EV charging install — from mud to megawatts.
Why EV Charging is Your Biggest Project Risk
Installing commercial EV charging is complex and risky. It involves multiple contractors, grid applications, and new regulations — creating the potential for costly delays and compliance failures.
Multiple Contractor Risk
Managing separate groundworks, electrical, and installation contractors introduces multiple points of failure, delays, and finger-pointing when things go wrong.
Part S Compliance Pressure
Part S of the Building Regulations now mandates EV charging in all new non-residential builds. Non-compliance risks project sign-off and costly remediation.
Grid Connection Bottlenecks
DNO applications and grid connection upgrades are the single biggest cause of project delays. Without expert management, timelines slip by months.

Founded by a Civil Engineer
Groundworks done right, every time
One Partner. Zero Headaches.
FusionTek provides a complete, end-to-end turnkey solution for commercial EV charging infrastructure — from initial design and groundworks to final commissioning and maintenance.
De-Risk Your Projects
One partner, one contract, one point of accountability. We eliminate the complexity of managing multiple contractors and guarantee compliance.
Eliminate Delays
Our in-house civil engineering team and established DNO relationships mean grid applications and groundworks happen on your timeline, not theirs.
Future-Proof Your Developments
Deliver high-value properties that meet the demands of modern tenants. EV charging infrastructure increases property values and tenant appeal.
Single Point of Contact
From initial design consultation through to final commissioning and ongoing maintenance — one dedicated project manager throughout.
From Design to Commissioning
Design Consultation
Early engagement to design the optimal solution for your development
DNO & Grid Applications
We manage all grid connection applications and upgrades
Civil Engineering
Trenching, ducting, and surface reinstatement by our in-house team
Installation & Commissioning
Hardware installation, testing, and full certification
EV Charging Cost Calculator
Estimate your Part S compliance costs and potential revenue in seconds. Adjust the sliders below to match your development.
Part S Status
Compliant
Charge Points
5
Required by Part S
Cable Routes
5
Future-proofing (20%)
Estimated Investment
£10,000 – £20,000
Including installation, groundworks & certification
Potential Annual Revenue
£13,797
Based on 60% utilisation at £0.45/kWh
Estimated Payback Period
14 months
Estimates are indicative and based on typical installation costs. A free site survey will provide an accurate quotation tailored to your specific requirements.
Real Results, Proven Delivery
Multi-Storey Office Complex — EV Infrastructure Retrofit
6
Chargers Installed
4 wks
Completion Time
£42K
Annual Revenue
0
Disruption Days
The Challenge
A major commercial property developer needed to retrofit EV charging infrastructure across a 200-space car park at an existing office complex. The site had limited electrical capacity, complex underground services, and the car park needed to remain operational throughout the works.
Our Solution
FusionTek delivered a complete turnkey solution — managing the DNO application for a power upgrade, designing an optimised cable routing plan to avoid existing services, and phasing the installation to keep 80% of spaces available at all times. Our in-house civil engineering team completed all groundworks, trenching, and surface reinstatement.
The Results
- Full Part S compliance achieved ahead of 2025 deadline
- Zero disruption days — car park remained operational throughout
- £42,000 annual revenue generated from charge point usage
- Property valuation increased by an estimated 8%
"FusionTek managed the entire project from start to finish. The phased approach meant our tenants were barely aware work was happening. The chargers are now generating significant revenue and our tenants love them."
David Harrison
Facilities Director — Meridian Property Group
Ready to achieve similar results for your organisation?
Book Your Free Site Survey
Our commercial team will assess your development, provide a detailed proposal, and ensure your EV charging infrastructure is designed for compliance, efficiency, and future growth.