Mon–Sat 8:00–18:00
Commercial EV charging installation
Commercial & Construction

New Build, New Regs: Is Your EV Charging Plan Compliant?

Part S of the Building Regulations now mandates EV charging in all new non-residential builds. FusionTek provides a complete, end-to-end turnkey solution.

Stop juggling contractors. One partner for your entire EV charging install — from mud to megawatts.

Part S Compliant
OZEV Approved
Nationwide Coverage
5-Year Warranty
The Challenge

Why EV Charging is Your Biggest Project Risk

Installing commercial EV charging is complex and risky. It involves multiple contractors, grid applications, and new regulations — creating the potential for costly delays and compliance failures.

Multiple Contractor Risk

Managing separate groundworks, electrical, and installation contractors introduces multiple points of failure, delays, and finger-pointing when things go wrong.

Part S Compliance Pressure

Part S of the Building Regulations now mandates EV charging in all new non-residential builds. Non-compliance risks project sign-off and costly remediation.

Grid Connection Bottlenecks

DNO applications and grid connection upgrades are the single biggest cause of project delays. Without expert management, timelines slip by months.

FusionTek engineering team

Founded by a Civil Engineer

Groundworks done right, every time

The FusionTek Solution

One Partner. Zero Headaches.

FusionTek provides a complete, end-to-end turnkey solution for commercial EV charging infrastructure — from initial design and groundworks to final commissioning and maintenance.

De-Risk Your Projects

One partner, one contract, one point of accountability. We eliminate the complexity of managing multiple contractors and guarantee compliance.

Eliminate Delays

Our in-house civil engineering team and established DNO relationships mean grid applications and groundworks happen on your timeline, not theirs.

Future-Proof Your Developments

Deliver high-value properties that meet the demands of modern tenants. EV charging infrastructure increases property values and tenant appeal.

Single Point of Contact

From initial design consultation through to final commissioning and ongoing maintenance — one dedicated project manager throughout.

Our Process

From Design to Commissioning

01

Design Consultation

Early engagement to design the optimal solution for your development

02

DNO & Grid Applications

We manage all grid connection applications and upgrades

03

Civil Engineering

Trenching, ducting, and surface reinstatement by our in-house team

04

Installation & Commissioning

Hardware installation, testing, and full certification

Part S Compliance Tool

EV Charging Cost Calculator

Estimate your Part S compliance costs and potential revenue in seconds. Adjust the sliders below to match your development.

50
5250500

Part S Status

Compliant

Charge Points

5

Required by Part S

Cable Routes

5

Future-proofing (20%)

Estimated Investment

£10,000 £20,000

Including installation, groundworks & certification

Potential Annual Revenue

£13,797

Based on 60% utilisation at £0.45/kWh

Estimated Payback Period

14 months

Estimates are indicative and based on typical installation costs. A free site survey will provide an accurate quotation tailored to your specific requirements.

Case Study

Real Results, Proven Delivery

Commercial & Construction

Multi-Storey Office Complex — EV Infrastructure Retrofit

West MidlandsNovember 20256 x 22kW Fast Chargers

6

Chargers Installed

4 wks

Completion Time

£42K

Annual Revenue

0

Disruption Days

The Challenge

A major commercial property developer needed to retrofit EV charging infrastructure across a 200-space car park at an existing office complex. The site had limited electrical capacity, complex underground services, and the car park needed to remain operational throughout the works.

Our Solution

FusionTek delivered a complete turnkey solution — managing the DNO application for a power upgrade, designing an optimised cable routing plan to avoid existing services, and phasing the installation to keep 80% of spaces available at all times. Our in-house civil engineering team completed all groundworks, trenching, and surface reinstatement.

The Results

  • Full Part S compliance achieved ahead of 2025 deadline
  • Zero disruption days — car park remained operational throughout
  • £42,000 annual revenue generated from charge point usage
  • Property valuation increased by an estimated 8%

"FusionTek managed the entire project from start to finish. The phased approach meant our tenants were barely aware work was happening. The chargers are now generating significant revenue and our tenants love them."

DH

David Harrison

Facilities Director — Meridian Property Group

Ready to achieve similar results for your organisation?

Get Started

Book Your Free Site Survey

Our commercial team will assess your development, provide a detailed proposal, and ensure your EV charging infrastructure is designed for compliance, efficiency, and future growth.

Free, no-obligation site survey
Detailed quotation within 10 working days
Full Part S compliance assessment
Scalable design for future expansion

Prefer to talk now?

Call our commercial team directly on our freephone number.

0800 774 7395

Request a Site Survey

Tell us about your development and we'll arrange a free assessment.

🏆Award Winning
🔌OZEV Grant
🛡️Safety Certified
UKCA & CE
Rolec EV Official Installer
F
FusionTek

Nationwide suppliers and installers of EV charging infrastructure. Commercial, domestic, and public sector solutions.

Services

Sectors

Contact

Operating Hours

Mon–Sat 8:00–18:00

© 2026 FusionTek Limited. All rights reserved.